Skip to content
Architectural blueprint
Finished interior

Design · Engineering · Finishing

Vision To Reality

Engineering-led finishing in Greater Cairo with 15% supervision, original invoices and zero material waste.

  • Interior design
  • Engineering supervision
  • Turnkey finishing
  • 3D visualisation
  • Original invoices
  • Zero material waste
  • Handover warranty

25+

Projects completed

12

Years experience

100%

Material transparency

0

Hidden fees

Services

Choose your path

Zero-waste guarantee on supervised packages

How we work

14 documented stages, from inspection to warranty

Every stage is supervised by an engineer and shared with you with photos in your client portal.

  1. Inspection

    Site survey, measurements and a technical report on the unit's condition.

  2. 3D Design

    Layouts, 3D renders and shop drawings approved before any work starts.

  3. Plumbing Foundation

    Water and drainage networks laid, pressure-tested and documented.

  4. Electrical Foundation

    Load schedule, conduits and wiring sized for every circuit.

  5. HVAC

    AC routes, drains and power points planned and installed.

  6. Flooring

    Levelled screed and flooring laid to engineering tolerances.

  7. Walls

    Plastering and wall preparation checked with laser levels.

  8. Ceiling

    Gypsum board ceilings, lighting coves and access panels.

  9. Carpentry

    Doors, wardrobes and kitchen units built to approved drawings.

  10. Paint

    Primer, putty and finish coats with the approved colour schedule.

  11. Fixtures

    Sanitary ware, switches and lighting fixtures installed and tested.

  12. Final Inspection

    Room-by-room snag list closed before handover.

  13. Handover

    Keys, as-built documents and original invoices delivered to you.

  14. Warranty

    Follow-up visits and warranty on supervised work.

Compare

The 15% fee that actually saves you money.

Independent workers vs YahiaDesign supervision across planning, cost control, timeline, and quality.

  • Planning & BOQ

  • Cost control

  • Timeline

Up to 30% material waste

Independent workers

Zero material waste

YahiaDesign 15% supervision

15% supervision only

YahiaDesign 15% supervision

The hidden cost of cheap finishing

Common failures that erase savings — and how engineering prevents them.

Fix cost: 15,000+ EGP

Wet wall nightmare

What goes wrong

Bathroom slope errors cause pooling, ruined tiles, and structural risk.

Engineering fix

Laser levels, drainage calculations, and wet-area waterproofing specs.

Fix cost: 25,000+ EGP

Electrical overload

What goes wrong

Wrong wire gauge for AC or kitchen loads risks overheating and fire.

Engineering fix

Load schedules, breaker coordination, and inspected terminations.

Waste: up to 30%

Material waste

What goes wrong

Guessed quantities create 20–30% excess you pay for — or stoppages.

Engineering fix

BOQ discipline, staged procurement, and site reconciliation.

Risk: total loss of advance

Unreliable subcontractors

What goes wrong

Advances without controls lead to half-finished, abandoned work.

Engineering fix

Milestone-based releases and documented site sign-offs.

A 15% supervision fee is not an added cost — it is insurance against 30% waste and rework.

Cost estimate

How much will your finishing actually cost?

Stop guessing. Use our calculator for a realistic estimate from your unit size and finishing level.

Open calculator
Estimated totalEGP 552,000
120 m²
Finishing level
Materials (est.)
EGP 480,000
Engineering supervision (15%)
EGP 72,000

Indicative estimate for a semi-finished unit. Your detailed BOQ follows the full calculator and a site visit.

From the blog

Tips before you finish your home

Practical advice from our engineers.

Free consultation

Ask an engineer

Quick technical answers from our team — before you commit to a contractor.

  • Response within 24 hours
  • Licensed engineers only
  • No obligation — just clarity

YahiaDesign engineering team

Finishing, MEP, and structural specialists

Category
Yahia Design

Essential tips before finishing

Technical checklist — PDF edition

Don't sign until you read this.

Download our technical checklist to spot developer defects before handover.